Puget_Sound_Energy_Savings_and_Energy_Center
Home > Puget Sound Energy Savings and Energy Center

Puget Sound Energy Savings and Energy Center

Industrial System Optimization Program

Upgrade your industrial site for less

If your business site performs manufacturing or processing, or its subsystems maintain long run-hours, use PSE's Industrial System Optimization Program (ISOP) to find and perform energy efficiency improvements that can lower your bills. You can also earn a valuable incentive to help cover the cost.

What you get*

If you qualify for PSE's Industrial System Optimization Program (ISOP), you may receive some or all of the following:

  • Hands-on guidance throughout the process from PSE's ISOP contracting partner
  • Optional performance tracking systems (PTS)—hardware or software add-ons that deliver energy usage data for your high-energy-usage equipment or industrial subsystems that don't already have built-in energy tracking
  • An action plan report, which includes:
    • A listing of low-cost/no-cost action items that your staff completed with PSE's ISOP contracting partner during your Optimization Event, with estimated yearly cost and energy savings for each measure
    • A listing of recommended low-cost/no-cost action items for you to perform after your Optimization Event, with estimated yearly cost and energy savings for each measure
    • A listing of recommended capital energy project opportunities, should you decide to invest more heavily in energy efficiency upgrades for your business site in the future
    • Information about your business site's energy usage, including overall percentages by equipment category (lighting, HVAC, refrigeration, etc.)

Implementation incentive

If you complete the requirements to receive an implementation incentive, its value is the lesser of:

  • $0.05 per verified kWh saved, or;
  • 70 percent of the combined cost of:
    • All performance tracking systems (PTS) installed
    • All recommended action items completed at your business site either during or within 120 days of your Optimization Event

* Funding availability subject to annual program budgets.

Last modified

Tags

This page has no custom tags.

Classifications

(not set)
(not set)